Other

Analytical Formulation for Early Cost Estimation and Material Consumption of Road Overpass Bridges

Volume: 12, Issue: 7, Pages: 716 - 725
Published: Apr 5, 2016
Abstract
Every construction project evolves through a series of stages, originating from the preliminary study followed by several design stages and finally the implementation of the design with the actual construction. Cost and material quantities estimates are produced throughout the life of a construction project and are used for different purposes depending on the available information and their expected accuracy. An easy to apply cost pre-estimating...
Paper Details
Title
Analytical Formulation for Early Cost Estimation and Material Consumption of Road Overpass Bridges
Published Date
Apr 5, 2016
Volume
12
Issue
7
Pages
716 - 725
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.