Match!
Fani Antoniou
Aristotle University of Thessaloniki
19Publications
4H-index
31Citations
Publications 19
Newest
#1Fani AntoniouH-Index: 4
#2Georgios N. Aretoulis (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 5
ABSTRACTThe choice of method of contractor compensation is a complex decision that should be taken by awarding authorities (AAs) based on a systematic and scientific examination of alternative opti...
2 CitationsSource
#1Georgios N. Aretoulis (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 5
#2Jason Papathanasiou (UoM: University of Macedonia)H-Index: 12
Last.Fani Antoniou (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 4
view all 3 authors...
Purpose This paper aims to rank and identify the most efficient project managers (PMs) based on personality traits, using Preference Ranking Organization METHod for Enrichment Evaluations (PROMETHEE) methodology. Design/methodology/approach The proposed methodology relies on the five personality traits. These were used as the selection criteria. A questionnaire survey among 82 experienced engineers was used to estimate the required weights per personality trait. A second two-part questionnaire s...
Source
Source
#1Fani AntoniouH-Index: 4
#2Dimitrios Konstantinidis (Alexander Technological Educational Institute of Thessaloniki)H-Index: 5
Last.Yiannis Xenidis (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 6
view all 4 authors...
ABSTRACTThis paper presents the total cost and cost distribution between activities required for the construction of reinforced concrete underpass bridges. The required material quantities of concrete, reinforcing steel, earthworks (excavation, soil improvement layer and backfilling), waterproofing works, joint formation and drainage system from 34 closed box section and slab frame underpasses from recent highway projects in Greece are statistically processed. Following analysis of this data, pr...
Source
#1Fani AntoniouH-Index: 4
#2Georgios N. Aretoulis (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 5
How to compensate highway construction contractors is a complex decision that should be taken based on scientific evidence. Four different multi-criteria decision making methods, i.e., the multi-attribute utility theory, the technique for order preference by similarity to ideal situation, the preference ranking organisation method for enriched evaluation (PROMETHEE) and the PROMETHEE group decision support system method were applied to two case study projects with different characteristics and a...
3 CitationsSource
#1Fani Antoniou (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 4
#2Georgios N. Aretoulis (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 5
Last.Glykeria Kalfakakou (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 5
view all 4 authors...
Source
Every construction project evolves through a series of stages, originating from the preliminary study followed by several design stages and finally the implementation of the design with the actual construction. Cost and material quantities estimates are produced throughout the life of a construction project and are used for different purposes depending on the available information and their expected accuracy. An easy to apply cost pre-estimating and material quantities formulation is proposed fo...
1 CitationsSource
#1Fani Antoniou (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 4
#2Dimitrios Konstantinidis (AHLEI: American Hotel & Lodging Educational Institute)H-Index: 5
Last.Georgios N. Aretoulis (A.U.Th.: Aristotle University of Thessaloniki)H-Index: 5
view all 3 authors...
The selection of the appropriate procurement system (PS) for major highway projects in Greece is central to their success, as the relevant interdependent interfaces and required contracts between stakeholders are numerous and complex. The PSs investigated are traditional, traditional fast track, design and build, private-public partnership, construction management, management contracts and partnering. The relevant selection criteria that were considered refer to the project characteristics, the ...
5 CitationsSource
#1Fani AntoniouH-Index: 4
Last.Georgios N. AretoulisH-Index: 5
view all 3 authors...
#1Fani AntoniouH-Index: 4
Last.Georgios N. AretoulisH-Index: 5
view all 3 authors...
12