The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia

Volume: 31, Issue: 7, Pages: 994 - 1005
Published: Oct 1, 2013
Abstract
This paper presents the accuracy of preliminary cost estimates prepared by Public Works Department (PWD), which is the largest public construction management in Malaysia. It attempts to understand the Quantity Surveyors' (QS) estimation accuracy in relation to public projects. This study analyses 83 projects of estimates and tender bids. The analysis includes three (3) estimating targets i.e. lowest bid, accepted bid and mean of the bids. To...
Paper Details
Title
The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia
Published Date
Oct 1, 2013
Volume
31
Issue
7
Pages
994 - 1005
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.