Time delay prediction for space telerobot system with a modified sparse multivariate linear regression method

Volume: 166, Pages: 330 - 341
Published: Jan 1, 2020
Abstract
Compared with general telerobot system, space telerobot system (STS) faces with more serious and complex time delay. In time delay prediction, the traditional sparse multivariate linear regressive (SMLR), auto regressive (AR), neural network (NN) and cubic polynomial model based (CBMB) approaches share lower efficiency or precision, when time delay is serious and complex. To solve this problem, time delay prediction for STS is discussed in this...
Paper Details
Title
Time delay prediction for space telerobot system with a modified sparse multivariate linear regression method
Published Date
Jan 1, 2020
Volume
166
Pages
330 - 341
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.