Buffer space hedging enabled production time variation coordination in prefabricated construction

Volume: 137, Pages: 106082 - 106082
Published: Nov 1, 2019
Abstract
In this paper, an on-site production time variation coordination is studied between a general contractor and a building contractor. To entice the building contractor to reduce its production time variation, which improves system performance but adds more pressure to the building contractor, a buffer space hedging (BSH) method is offered by the general contractor. The BSH is to reserve more spare space at an intermediate warehouse and serves for...
Paper Details
Title
Buffer space hedging enabled production time variation coordination in prefabricated construction
Published Date
Nov 1, 2019
Volume
137
Pages
106082 - 106082
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.