Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality

Volume: 38, Issue: 6, Pages: 502 - 514
Published: Jun 5, 2019
Abstract
Defects and quality problems in off-site manufacturing of building parts are caused by different variables. Subsequently, rework is required during on-site subassembly aggregation. Rework and tampering with prefabricated parts has implications including suboptimal structural/non-structural performance, delays and increased costs. Currently there is a gap in the off-site construction literature in developing effective interventions to reflect on...
Paper Details
Title
Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality
Published Date
Jun 5, 2019
Volume
38
Issue
6
Pages
502 - 514
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.