Design and construction risks in BOT type mega transportation projects

Volume: 26, Issue: 10, Pages: 2223 - 2242
Published: Jun 19, 2019
Abstract
Purpose In build-operate-transfer (BOT) transportation projects, design and construction phases are critical in terms of their effect on time and cost overruns. The purpose of this paper is to identify the role of risk factors affecting these phases and their significance level for BOT transportation projects. Design/methodology/approach Design and construction risks were determined and then validated by focus group discussions. Afterwards, an...
Paper Details
Title
Design and construction risks in BOT type mega transportation projects
Published Date
Jun 19, 2019
Volume
26
Issue
10
Pages
2223 - 2242
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.