A multiobjective optimization approach for selecting risk response strategies of software project: From the perspective of risk correlations

Published on Jan 1, 2019in International Journal of Information Technology and Decision Making 2.86
· DOI :10.1142/S0219622019410013
Dengsheng Wu10
Estimated H-index: 10
(CAS: Chinese Academy of Sciences),
Xiaoqian Zhu7
Estimated H-index: 7
(CAS: Chinese Academy of Sciences)
+ 2 AuthorsJianping LiXiaolei19
Estimated H-index: 19
(CAS: Chinese Academy of Sciences)
Cite
Abstract
Studies on software risk response theories and methods play an important role in improving the success rate of software project. With the requirement of software risk management, the existing single-objective risk response strategies section model is difficult to manage software risks effectively. This paper regards software risk response cost and software risk exposure as optimization objectives and proposes a multiobjective risk response strategies optimization model for software project. Furthermore, it analyzes the risk correlation from the perspective of risk probability dependence and risk loss interaction and puts forward a multiobjective risk response strategies optimization model for software project from the perspective of risk correlation. Empirical analysis results show that there is a trade-off relationship between the software risk exposure and software risk response cost. The software manager can identify the corresponding optimal risk response strategies according to the actual risk respon...
  • References (40)
  • Citations (2)
Cite
References40
Newest
Published on May 1, 2019in IEEE Transactions on Fuzzy Systems 8.76
Xiaofeng Xu1
Estimated H-index: 1
(China University of Petroleum),
Jun Hao1
Estimated H-index: 1
(China University of Petroleum)
+ 1 AuthorsYirui Deng1
Estimated H-index: 1
(China University of Petroleum)
Obtaining a multiresource allocation scheme for multitask influenced by uncertain factors is a critical problem in a collaborative logistics network. This paper presents an optimal allocation model of fuzzy resources for multistage random logistics tasks based on the six-point trapezoidal fuzzy number and the membership function. Besides, considering task demands and resource constraints, a new cost–time–quality multiobjective programming of N–N task–resource assignment is introduced, which can ...
3 Citations Source Cite
Published on Oct 1, 2018in Information Sciences 5.52
Dengsheng Wu10
Estimated H-index: 10
(CAS: Chinese Academy of Sciences),
Jianping LiXiaolei19
Estimated H-index: 19
(CAS: Chinese Academy of Sciences)
+ 3 AuthorsQianzhi Dai1
Estimated H-index: 1
(Hefei University of Technology)
Abstract Project risk response planning is an important component of project risk management to help ensure project success. However, thus far, the relevant research has ignored the correlations between risk factors during different project development subprocesses. This study proposes a novel risk response method by opening the black box of the project process and considering the risk correlations among different subprocesses to help practitioners create a practical risk response plan. In our m...
2 Citations Source Cite
Published on Sep 1, 2018
Ryle S. Perera2
Estimated H-index: 2
(Macquarie University),
Kimitoshi Sato3
Estimated H-index: 3
(Kanagawa University)
Motivated by the Basel III requirement we analyze an optimal Capital Adequacy Ratio subject to foreclosure risk exposure. We assume that the banker invests in treasuries, a stock index and a loan portfolio, where he/she wishes to maximize his/her expected utility of terminal wealth by selecting optimal investment and risk control strategies. The dynamics of the stock index and the banker’s risk exposure towards foreclosure is modeled as two independent compensated pure jump Levy Processes. By ap...
1 Citations Source Cite
Published on May 4, 2018in Journal of Risk Research 1.70
Chunbing Bao3
Estimated H-index: 3
(CAS: Chinese Academy of Sciences),
Jianping LiXiaolei19
Estimated H-index: 19
(CAS: Chinese Academy of Sciences),
Dengsheng Wu10
Estimated H-index: 10
(CAS: Chinese Academy of Sciences)
Extant research has focused upon assessing individual risks with the aid of risk matrices. Although risk aggregation is an important issue in risk management, aggregation of risks measured by risk matrices remains unresolved despite the wide usage of risk matrices. This paper proposes a framework to resolve the problem. We start from modifying the two notions of non-aggregatability of risk matrices, namely, qualitative description of inputs and non-comparability of different types of consequence...
6 Citations Source Cite
Published on Jan 1, 2018in Risk Analysis 2.56
Jianping LiXiaolei19
Estimated H-index: 19
(CAS: Chinese Academy of Sciences),
Chunbing Bao3
Estimated H-index: 3
(CAS: Chinese Academy of Sciences),
Dengsheng Wu10
Estimated H-index: 10
(CAS: Chinese Academy of Sciences)
Risk matrices have been widely used as a risk evaluation tool in many fields due to their simplicity and intuitive nature. Designing a rating scheme, i.e., determining the number of ratings used in a risk matrix and assigning different ratings to different cells, is an essential part of risk matrix construction. However, most of the related literature has focused on applying a risk matrix to various fields, instead of researching how to design risk matrices. Based on the analysis of several curr...
7 Citations Source Cite
Published on Jan 1, 2018in European Journal of Operational Research 3.81
Jianping LiXiaolei19
Estimated H-index: 19
(CAS: Chinese Academy of Sciences),
Xiaoyang Yao2
Estimated H-index: 2
(CAS: Chinese Academy of Sciences)
+ 1 AuthorsDengsheng Wu10
Estimated H-index: 10
(CAS: Chinese Academy of Sciences)
We consider multiple criteria decision aiding (MCDA) in the case of interactions between criteria. In dealing with interactions between criteria, fuzzy measures and integrals have demonstrated great advantages. Nevertheless, the determination of fuzzy measures has proven difficult because the capacities of not only single criterion but also all subsets of criteria need to be identified. Due to the value judgment essence of MCDA, the attitudes of the decision maker (DM) are typically modeled to i...
13 Citations Source Cite
Jianping LiXiaolei19
Estimated H-index: 19
,
Minglu Li6
Estimated H-index: 6
+ 2 AuthorsHao Song4
Estimated H-index: 4
For all of the many advantages and enormous benefits that information technology has brought to us, it has subjected to increasing risks that need enough attention. Bayesian network (BN) is an important probabilistic inference approach to support reasoning under uncertainty. This paper describes how BN is applied to quantify the occurrence probability of software process risk factors and the influence strength among the process risk factors in the context of Chinese trustworthy software. The inf...
6 Citations Source Cite
Published on Apr 15, 2015in Expert Systems With Applications 4.29
Zhi-Ping Fan27
Estimated H-index: 27
(NU: Northeastern University),
Yong-Hai Li1
Estimated H-index: 1
(Henan University of Technology),
Yao Zhang1
Estimated H-index: 1
(NU: Northeastern University)
A new pragmatic CBR-based method for generating project risk response strategies is proposed.The most similar historical cases can be retrieved using the method.The inapplicable strategies are revised to support the generation of the candidate strategy set.The desirable project risk response strategies are generated through the expert's evaluations.Case problem on risk response of the subway project is solved based on this study. Risk response is an important work in project risk management (PRM...
24 Citations Source Cite
Published on Feb 7, 2015in Journal of Risk Research 1.70
Anna Corinna Cagliano7
Estimated H-index: 7
(Polytechnic University of Turin),
Sabrina Grimaldi6
Estimated H-index: 6
(Polytechnic University of Turin),
Carlo Rafele10
Estimated H-index: 10
(Polytechnic University of Turin)
The pressure for increasing quality while reducing time and costs places particular emphasis on managing risk in projects. To this end, several models and techniques have been developed in literature and applied in practice, so that there is a strong need for clarifying when and how each of them should be used. At the same time, knowledge about risk management is becoming a matter of paramount importance to effectively deal with the complexity of projects. However, communication and knowledge cr...
31 Citations Source Cite
Cited By2
Newest
Published on Jul 1, 2019in Information Sciences 5.52
Jianping LiXiaolei19
Estimated H-index: 19
(CAS: Chinese Academy of Sciences),
Jin Zhang1
Estimated H-index: 1
(CAS: Chinese Academy of Sciences),
Weilan Suo1
Estimated H-index: 1
(CAS: Chinese Academy of Sciences)
Abstract To promote trade facilitation and regional integration, several cross-border transport infrastructure (CBTI) projects have been implemented and are accompanied by high complexity, difficulty, and uncertainty. This presents a multi-dimensional challenge for risk assessment. However, the challenge is amplified by the presence of dual interdependent effects induced by risk factor cascading propagation and project interaction. The purpose of this study involves developing a fuzzy decision a...
1 Citations Source Cite
Published on Mar 31, 2019in Journal of Risk Research 1.70
Chunbing Bao3
Estimated H-index: 3
,
Jie Wan1
Estimated H-index: 1
+ 1 AuthorsJianping LiXiaolei19
Estimated H-index: 19
AbstractRisk matrices have been proven as useful risk management tools, especially in the cases where data are not sufficient. Current usage of risk matrices in both literature and practice is related to single risk assessment. However, sometimes the decision makers care more about the overall risk consisting of several of single risks, which is in the scope of the aggregation of single risks measured by risk matrices. Unfortunately, two notions, namely, incomparability of different qualitative ...
Source Cite