Optimal decision-making for a single-stage manufacturing system with rework options

Volume: 7, Issue: 1, Pages: 90 - 104
Published: Aug 29, 2018
Abstract
This study investigates a manufacturing system with a single-stage production system that sometimes produces imperfect items. In this system, we assume that the rework process can start after the regular production process (immediate rework) or when the inventory of perfect goods is equal to zero (delayed rework). Also, we assumed non-zero set-up time for rework. Two models are presented for manufacturing systems with re-workable goods. The...
Paper Details
Title
Optimal decision-making for a single-stage manufacturing system with rework options
Published Date
Aug 29, 2018
Volume
7
Issue
1
Pages
90 - 104
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.