IDENTIFICATION OF CRITICAL FACTORS FOR DELAY IN METRO RAIL PROJECTS IN INDIA

Volume: 6, Issue: 1, Pages: 30 - 39
Published: Jun 19, 2018
Abstract
Purpose of the study:World over, transportation infrastructure projects face delays in commissioning and India is no exception. This study is carried out with an objective to specifically identify the critical delay factors in the commissioning of metro rail projects in India. Methodology: A questionnaire survey was conducted to identify the major causes of delay from the opinion of clients, contractors and consultants. Calculation of...