A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong

Volume: 185, Pages: 366 - 381
Published: Jun 1, 2018
Abstract
The construction industry in Hong Kong has been exposed to serious housing production issues such as insufficient manpower, safety, environmental concerns and inefficient housing supply. Prefabrication housing production has shown as efficient construction model which enables to overcome these issues and it is applied in construction industry in Hong Kong. In this paper, hybrid modeling techniques that combine system dynamics and discrete event...
Paper Details
Title
A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong
Published Date
Jun 1, 2018
Volume
185
Pages
366 - 381
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.