Performance Evaluation of Alaoji Thermal Power Plant

Volume: 4, Issue: 2, Pages: 112 - 119
Published: Jan 1, 2018
Abstract
Electricity supply in Nigeria is epileptic and characterized by extensive outages. The new NIPP plants constructed have not improved the power situation in the country. The performance of Alaoji Thermal Power Station being one of the new NIPP plants with an installed capacity of 504.4MW (consisting of 4 X 126.1MW GE frame-9EA gas turbines) was studied. The study evaluated the performance of the plant for the period of January to December, 2016....
Paper Details
Title
Performance Evaluation of Alaoji Thermal Power Plant
Published Date
Jan 1, 2018
Volume
4
Issue
2
Pages
112 - 119
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.