High voltage performance of BARC-TIFR Pelletron accelerator

Published: Sep 1, 2014
Abstract
The 14 UD Pelletron Accelerator at TIFR, Mumbai is operational since its inception in 1988. It was decided to impart enough time for High voltage conditioning to achieve higher operational voltage. Prior to this, comprehensive works such as replacing all the sputter ion Pumps and Titanium sublimation pumps across the Accelerator tube with new or refurbished ones and replacement of Alumina balls in the SF
Paper Details
Title
High voltage performance of BARC-TIFR Pelletron accelerator
Published Date
Sep 1, 2014
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.