Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines

Volume: 68, Issue: 1, Pages: 29 - 42
Published: Oct 1, 2000
Abstract
This work deals with production smoothing, one of the keys of success of Just In Time and Lean Production. By levelling the load of the workstations, production smoothing allows a regular material flow, shorter manufacturing lead times, and lower work in process. Different solutions to the mixed-model assembly lines sequencing problem have been proposed in literature. In this paper, a Multi-Agent System is presented, which solves this problem...
Paper Details
Title
Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines
Published Date
Oct 1, 2000
Volume
68
Issue
1
Pages
29 - 42
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.