Match!
Computers & Industrial Engineering
IF
3.52
Papers
5801
Papers 6067
1 page of 607 pages (6,067 results)
Newest
#1Mina Dehghani (Allameh Tabataba'i University)
#2Vahab Vahdat (NU: Northeastern University)H-Index: 1
Last.Seyedmohammad Salehi (UD: University of Delaware)H-Index: 1
view all 0 authors...
Abstract Design of a reliable network in presence of flow loss has become the primary objective of today’s network designers. However, there are other important conflicting objectives that hinder the process of efficient network design. This study proposes a multi-objective optimization model for reliable communication flow networks, including maximizing the network reliability, minimizing total cost, and maximizing network flow, simultaneously. The total cost comprises the cost of construction ...
#1James C. Chen (NTHU: National Tsing Hua University)H-Index: 16
#2Tzu-Li Chen (FJU: Fu Jen Catholic University)H-Index: 12
Last.Yu-Hsin Lee (NTHU: National Tsing Hua University)
view all 0 authors...
Abstract This paper focuses on the parcel hub scheduling problem with shortcuts (PHSPwS), which is a critical inbound scheduling problem in parcel delivery industries such as postal service. PHSPwS employs shortcuts to determine the unloading schedule of inbound trailers/trucks in the closed-loop sorting process to minimize total makespan. PHSPwS not only considers the unequal batch sizes and various arrival times of inbound trailers but most importantly, the alternative parcel routing caused by...
#1Erfan Hassannayebi (Islamic Azad University Central Tehran Branch)H-Index: 7
#2Morteza Boroun (UT: University of Tehran)
Last.H. Kor (UT: University of Tehran)H-Index: 4
view all 0 authors...
Abstract In urban metro systems, several factors such as passenger congestion may affect the movement of trains, resulting in significant deviations from the planned timetable. This study proposes a meta-model simulation-based optimization approach for minimizing the passenger wait time under random disturbances. The modeling framework is based on a hybrid discrete-event simulation and response surface methodology (RSM), thereby capturing the benefits of both methods. The verification process is...
#1Neelesh Haulder (RMIT: RMIT University)
#2Arun Kumar (RMIT: RMIT University)H-Index: 9
Last.Nirajan Shiwakoti (RMIT: RMIT University)H-Index: 16
view all 0 authors...
Abstract The Purpose of this paper is to investigate the use of software packages (SP) aimed at the supply chain management (SCM) market. The aim is to analyse and classify the range of software functionalities offered by a variety of SCM-SPs currently in the market. This is important to gain an insight into the current and future trend in demands for applications of information& communication technology (ICT) for SCM. The study assumes that most ICT hardware used for SCM processes will require ...
#1Hao Luo (SZU: Shenzhen University)
#2Xuan Yang (WHU: Wuhan University)
Last.Wang Ka (WHU: Wuhan University)H-Index: 17
view all 0 authors...
Abstract To be part of very competitive supply chains, retailers and wholesalers expect small batch deliveries within short and dependable time window. Manufacturing companies have to cater to their customer’s requirement and shift their production strategy from traditional make-to-stock (MTS) to make-to-order (MTO). Meanwhile, the operation in warehouse is also changed from long term storage to short term cross-docking (CD). Based on a real-life industrial case, it can be found that, in order t...
#1José David Canca Ortiz (University of Seville)H-Index: 12
#2Alicia De-Los-Santos (UCO: University of Córdoba (Spain))H-Index: 5
Last.Juan A. Mesa (University of Seville)H-Index: 16
view all 0 authors...
Abstract We consider the problem of scheduling the construction of a railway rapid transit transportation network. We assume that the network topology is already known. The problem consists of sequencing the construction tasks in order to maximize the long term profit of the project. The problem can be viewed as a resource-constrained project scheduling problem, where both the budget and available construction equipment act as resources influencing the schedule. Since lines segments can be put i...
Abstract The objective of this paper is to present a bibliometric analysis of the applications of Data Mining (DM) and Machine Learning (ML) techniques in the context of public health from 2009 to 2018. A systematic review of the literature was conducted considering three major scientific databases: Scopus, Web of Science and Science Direct. This enabled an analysis of the number of papers by journal, the countries where the applications were carried out, which databases are more commonly used, ...
#1Heiko Diefenbach (Technische Universität Darmstadt)
#2C. H. Glock (Technische Universität Darmstadt)H-Index: 25
Abstract Order picking is considered one of the most labor- and cost-intensive warehouse operating processes. Regularly, order pickers are exposed to severe physical demands, which increase the likelihood for developing muscular-skeletal disorders, such as lower back pain. Muscular-skeletal disorders cause significant compensation, recovery and deficiency costs and are expected to gain further importance in the future due to an aging workforce. Both companies and workers may therefore benefit fr...
#1Reza Hamzeh (University of Auckland)H-Index: 1
#2Xun Xu (University of Auckland)H-Index: 31
Abstract In recent decades, several methods have been developed and used for selecting the most preferable technology. Considering this diversity, the decision-maker has a difficult task to choose the most appropriate method, and to justify the choice. This article performs a comprehensive review of commonly used Multi-Attribute Decision Making (MADM) methods for selecting appropriate technologies in the field of manufacturing. Using a systematic approach, papers were identified that report tech...
#1Zili Wang (Beihang University)H-Index: 3
#2M.S. Bowen Cui (Beihang University)
Last.M.S. Zheng Zuo (Beihang University)
view all 0 authors...
Abstract A joint planning of spare parts and maintenance workers in cross-echelon and lateral transshipment can reduce total system cost; however, only a limited part of the literature considers this combination. In this paper, we propose an agent-based generic evaluation model for the joint planning of resources by examining the multi-echelon inventory system with the operation management of multi-component equipment. First, a dual-clock failure modelling mechanism is provided to accurately gen...
12345678910