Match!
Kumar Neeraj Jha
Indian Institute of Technology Delhi
61Publications
14H-index
1,285Citations
Publications 59
Newest
#1Ajit Kumar Sinha (IITD: Indian Institute of Technology Delhi)
#2Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
Source
The purpose of this paper is to develop a qualitative framework for the selection of the most appropriate optimization algorithm for the multi-objective trade-off problem (MOTP) in construction projects based on the predefined performance parameters.,A total of 6 optimization algorithms and 13 performance parameters were identified through literature review. The experts were asked to indicate their preferences between each pair of optimization algorithms and performance parameters. A multi-crite...
Source
#1G.S. Vyas (COEP: College of Engineering, Pune)H-Index: 3
#2Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
Last.N. R. Rajhans (COEP: College of Engineering, Pune)
view all 3 authors...
ABSTRACTGreen building (GB) rating systems are developed to measure the level of extent or sustainability of buildings. It is very important to focus on the attributes that require more cost and ar...
Source
Source
#1Satish Kumar Viswanathan (IITD: Indian Institute of Technology Delhi)
#2Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
Source
#1G.S. Vyas (COEP: College of Engineering, Pune)H-Index: 3
#2Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
Last.Dilip A. PatelH-Index: 1
view all 3 authors...
2 CitationsSource
#1Kamalendra Kumar Tripathi (IITD: Indian Institute of Technology Delhi)H-Index: 2
#2Abid Hasan (UniSA: University of South Australia)H-Index: 3
Last.Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
view all 3 authors...
AbstractEvaluating the performance of construction organizations is of vital importance for their continuous improvement and long-term survival. Performance measurement enables organizations to compare their performance with that of others to remain competitive in the business. Consequently, identification and evaluation of relevant performance measurement factors is an important research agenda. Although performance measurement at the level of projects has been studied in depth, it has not been...
Source
#1Kamalendra Kumar Tripathi (IITD: Indian Institute of Technology Delhi)H-Index: 2
#2Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
AbstractTraditionally, construction organizations with a track record of successful project completion were considered successful construction organizations. However, if construction projects were ...
2 CitationsSource
#1Abhilasha Panwar (IITD: Indian Institute of Technology Delhi)H-Index: 1
#2Kumar Neeraj Jha (IITD: Indian Institute of Technology Delhi)H-Index: 14
AbstractIn recent years, the number of stakeholders of construction projects has significantly increased; this has required the simultaneous achievement of competing objectives, such as reductions ...
1 CitationsSource
#1Abid Hasan (UniSA: University of South Australia)H-Index: 3
#2Kumar Neeraj Jha (IITs: Indian Institutes of Technology)H-Index: 14
Purpose Delays in construction projects can be very expensive due to their adverse effects on project cost and profit margin. To overcome this problem, clients in the construction industry sometimes use schedule incentive/disincentive (I/D) contracting strategy. However, previous studies have shown that inadequate understanding and wrong implementation of schedule I/D provisions could result in unintended results. Moreover, the use of the I/D contracting method is in its initial stages in many c...
Source
123456