Match!
Anil Sawhney
Liverpool John Moores University
Construction managementEngineeringSystems engineeringOperations managementBuilding information modeling
99Publications
17H-index
1,214Citations
What is this?
Publications 100
Newest
Last. Anil SawhneyH-Index: 17
view all 5 authors...
Creation of large healthcare infrastructure facilities involves complex construction projects. These complex projects face the risk of poor delivery in terms of time adherence and end up in delays. Identification of sector-specific factors of delay at a regional level can help with timely delivery of projects. This paper intends to investigate the challenges in the construction of hospitals in India. The study was based on a qualitative approach and used content analysis to investigate the facto...
1 CitationsSource
#1Anil SawhneyH-Index: 17
#2Mike RileyH-Index: 5
view all 3 authors...
Source
#1Anil SawhneyH-Index: 17
Last. Javier Irizarry (LJMU: Liverpool John Moores University)
view all 3 authors...
Source
#1Ritu Ahuja (Amity University)H-Index: 4
#2Anil Sawhney (LJMU: Liverpool John Moores University)H-Index: 17
Last. Samya Rakshit (Amity University)H-Index: 1
view all 5 authors...
ABSTRACTThis paper studies the adoption of Building Information Modelling (BIM) in emerging markets. The factors responsible for the adoption of BIM are studied in the context of Indian architectur...
5 CitationsSource
#1Kamal K. Mukherjee (IITs: Indian Institutes of Technology)
#2K.C. Iyer (IITs: Indian Institutes of Technology)
Last. Anil Sawhney (LJMU: Liverpool John Moores University)H-Index: 17
view all 3 authors...
A perceived uniqueness of real estate (RE) projects has led to a view among RE practitioners that since no two RE projects are the same, they must all follow their own unique set of processes. Further, local exigencies often result in the very processes agreed at the beginning of every project being changed, thereby making projects unpredictable for delivery within time and budget, or to the standards of quality expected. Maintaining the need to follow pre-defined standard processes in RE operat...
Source
#1Yash Kumar Mittal (School of Planning and Architecture, Delhi)
#2Virendra Kumar Paul (School of Planning and Architecture, Delhi)H-Index: 2
Last. Anil Sawhney (LJMU: Liverpool John Moores University)H-Index: 17
view all 3 authors...
Development of a nation is directly related to the accomplishment of public infrastructure projects. They cater to the objectives of sector-specific demand and accrue benefits in other related fields. These architectural engineering projects contribute to the overall development, which is complex to measure in tangible terms alone, but call for establishing indicators for measuring intangible benefits as well. Delay in projects is considered to affect the tangible cost benefits. It is, however, ...
Source
#1Manav Mahan Singh (Public Works Department)H-Index: 2
#2Anil Sawhney (LJMU: Liverpool John Moores University)H-Index: 17
Last. André Borrmann (TUM: Technische Universität München)H-Index: 18
view all 3 authors...
ABSTRACTAs the adoption of Building Information Modelling (BIM) becomes pervasive and its level of application matures, the need to incorporate domain-specific knowledge in BIM authoring tools is also increasing. Rule-based scripts that assist and guide the modeller in model authoring are needed to enhance the level of usage of BIM. The authors developed a framework for incorporation of rule-driven domain knowledge into BIM authoring tools. With the objective of customizing the modelling process...
5 CitationsSource
#1Ritu Ahuja (Amity University)H-Index: 4
#2Anil Sawhney (LJMU: Liverpool John Moores University)H-Index: 17
Last. Mohammed Arif (University of Wolverhampton)H-Index: 16
view all 3 authors...
Purpose The purpose of this paper is to describe the process through which an organization develops organizational capabilities by tapping the technical skills and social skills of its employees in the use of Building Information Modeling (BIM) to deliver lean and green project outcomes. The resulting framework for BIM-based organizational capabilities development comprising of three hierarchical layers – technology, process and outcomes – is explained. Design/methodology/approach For this study...
Source
#1Raghu Rama D.T.V. Swamy (Amity University)
#2Piyush Tiwari (University of Melbourne)H-Index: 14
Last. Anil Sawhney (Amity University)H-Index: 17
view all 3 authors...
Purpose The purpose of this paper is to understand the factors that affect the performance of projects being implemented on the public-private partnership (PPP) framework, with specific reference to urban drinking water sector in India. Design/methodology/approach A listing of factors that have a bearing on project performance have been developed based on a review of the literature. Through a survey, seven factors that are relevant to the Indian context were determined. Interviews were then cond...
Source
#1Shilpi Singh (Amity University)H-Index: 2
#2Samya Rakshit (Amity University)H-Index: 1
Last. Anil Sawhney (LJMU: Liverpool John Moores University)H-Index: 17
view all 5 authors...
With increasing impact of human survival on the environment and perpetual debate of our responsibility towards future generations, sustainability has come a long way. With urbanization and sustained economic development in India, greater building activity is expected, as India gears up to build 70–80% of the expected future building stock. As developing countries fight for a greater role in changing the environmental scene globally, role of sustainability in construction education has gained amp...
1 CitationsSource
12345678910